Concrete was poured for the front porch, sidewalk, back patio, and generator pad. The front yard is getting graded and the the final stone was going on the driveway. The old existing garage/apartment is getting a face lift with new siding and a new roof to match the new house. The kitchen counter was laser measured. The master bathroom tile work has started.