In the last 3 weeks, there has been a lot accomplished, despite the snow and ice storms. The propane tank was buried, the septic tank pump was buried and connected to the existing septic system, the water was rerouted from the well to the house, the back deck floor was completed, the back porch work has started, the front door was installed, and the drywall panels were hung throughout the house.
|