It snowed several inches this past weekend. The drywall work is done and the heat is on. The carpenter started the interior trim work and hanging all of the doors. Painting of the interior will start next week. The Hardie board siding was delivered and the crew started working on the exterior trim. The siding and exterior stone work will have to wait until next week because the next few days are supposed to be brutally cold.
0 Comments
In the last 3 weeks, there has been a lot accomplished, despite the snow and ice storms. The propane tank was buried, the septic tank pump was buried and connected to the existing septic system, the water was rerouted from the well to the house, the back deck floor was completed, the back porch work has started, the front door was installed, and the drywall panels were hung throughout the house.
|